Taj-mah-deck (cont.)

Page 1  |  Page 2
IMG_0723.JPG
Level 2 surface
IMG_0737.JPG
Weekend 15: tub delivered, slight adjustments needed.
IMG_0756.JPG
Railing post closest to tub needed to be relocated to allow clearance for cover lifter.
IMG_0736.JPG
Shade structure for working on level 3.
IMG_0741.JPG
Level 3 in progress. Cutting decking to fit around bench supports takes time
IMG_0750.JPG
Weekend 16: level 3 decking complete
IMG_0753.JPG
All three levels have decking. Now for the bench, the steps, the beams and latillas, the railing, the siding the trim, the staining, the ... argggh!
IMG_0816.JPG
2 weeks of military duty and a few weeks from taking pictures but progress is being made. The steps are completed over weekends 19 and 20
IMG_0827.JPG
Movable steps wrap around the front of the hot tub. The hot tub was connected and filled on Sep 12th ( weekend 21).
IMG_0824.JPG
Steps to the third level. Sample of the siding is visible.
IMG_0826.JPG
Weekends 21 and 22 the bench is completed, including adjustments and the railing by the hot tub is started.
IMG_0828.JPG
Another view of the bench.
IMG_0799.JPG
Weekend 23: crane for lifting 14 foot 6x10 beams.
IMG_0800.JPG
Lift in progress
IMG_0802.JPG
One down, the second on the way.
IMG_0806.JPG
3rd beam on the way.
IMG_0811.JPG
Beams are all up -- no smashed fingers and more importantly no hernias.
IMG_0812.JPG
View of the beams in place, partial railing visible in foreground
IMG_0817.JPG
19 foot long 2 x 6 joists, 2 feet O/C will support latillas for shade.
IMG_0823.JPG
Detail of beam, corbel and joists. Latillas will be installed after staining.
IMG_0820.JPG
Balusters installed above hot tub.
IMG_0821.JPG
View includes joists and balusters in foreground.